TARSPRA / Resin installation planner

OptiLay

Structure First. Surface Second.

New installation
2Review & results
  1. 1Survey & levels
  2. 2Excavation
  3. 3Drainage
  4. 4Foundation & base
  5. 5Surface

Project & build-up

Structure check

Outstanding structure checks must be resolved before surfacing.

Material take-off

Quantities withheld until coverage and recipe are confirmed. DALTEX preset supports exact 15 or 18 mm depths only; other recipes need batch-specific supplier instructions.

DALTEX mix-design guidance

Install location

The postcode of your installation site.

Install date

Resin & catalyst

Catalyst
VA5

Use the exact binder and catalyst printed on your kit. Aggregate brand alone does not identify the resin.

Daltex VA5: published temperature ranges are available, but the per-kit dosing basis needs manufacturer confirmation.
Installation sections1 section
Driveway
Working hours
20 minutes120 minutes
Unsaved changes are kept for this session only.

On-site catalyst check

Daltex · 7.5 kg kit · measured conditions only. Forecast and cure checks remain separate.

Dose not confirmed

Record measured air temperature, humidity and dry conditions first.

Site record & crew brief